ID Task Description Deliverables Duration
(Days)
People* Resources
O1.0
Project
Management
Ensure that the
project is on
schedule and on
budget
Specifications met
in a timely manner
80
Andrew
PC
O2.0
Documentation
Keep records of
design decisions,
research, and tests
Engineering
notebooks and A-
3 reports
80
A, Al, G, K, R
PC,
Notebooks
F1.0
Project Selection
Select a project
A verbal decision
12
A, Al, G, K, R
Notebooks
F2.0
Requirement
Specifications
Technical
Description of
project goals
Document
16
A, Al, G, K, R
PC
F3.0
System Design
and
Project Plan
Description of
systems operation,
project plan, and
budget
Document
9
A, Al, G, K, R
PC
F4.0
System Layout
Develop a
plan for
device operation
and functionality
Notebook
documentation
11
A,Al, G, K, R
Notebooks
F5.0
Device Design
Design the device
Detailed design of
all components
47
A, Al, G, K, R
PC
F6.0
Sensor Placement
Select appropriate
force sensors.
Design appropriate
electrical interface
and placement
Detailed design,
Schematics
7
Ryan
PC
F7.0
Dispensing
Mechanism Design
Design the
extrusion method
and motor system
Detailed design,
Solidworks
drawing
14
Andrew
PC
F8.0
User Interface
Select the
appropriate LCD
and bar code
scanner. Design
appropriate
electrical interface
Detailed design,
Schematics
20
Grant
PC
F9.0
Microprocessor
Interface
Microprocessor to
operate all
components
Detailed design
20
Aldo
PC